GH-PPA-DRAFT-08

20 MW Thermal Generating Plant, Saltpond, Ghana

Lushann International Power Development (Ghana) Ltd · Thermal (Gas) · 20.00 MW · Near Saltpond, Central Region, Ghana

Summary

A 20 MW natural gas plant near Saltpond (Phase I of a contemplated ~400 MW expansion, not committed under this PPA), supplying ECG under a 20-year capacity-and-energy PPA signed 20 May 2008. The tariff combines a 3.89 US cents/kWh energy charge with a 3.0 US cents/kWh capacity charge, both adjusted annually for fuel cost and inflation, with a take-or-pay obligation.

Key terms

Offtaker
Electricity Company of Ghana (ECG)
Signing date
2008-05-20
Financial close
—
Commercial operation
—
Contract end
2028-05-20
Contract duration
20 years
Contract status
Active
Tariff structure
Capacity + Energy
Capacity charge
—
Energy charge
—
Key risk features
Take-or-pay
Indexation formula
Energy Price adjusted annually via EP(new) = EP(old) + FPA + AIA, where FPA tracks actual fuel cost changes (natural gas or liquid fuel) from a US$4/MMBTU base and AIA is an annual inflation allowance approved by PURC. Both the Energy Price and the Capacity Charge are additionally renegotiated with PURC and the Buyer after the first 10 years of the 20-year term.