AKSA Takoradi 900 MW Combined Cycle Power Plant

AKSA Energy Company Ghana Limited · Thermal (Gas) · 900.00 MW · Takoradi, Ghana

Summary

A 900 MW (ISO) two-phase natural gas combined-cycle plant in Takoradi, supplying ECG under a 20-year capacity-and-energy PPA signed 8 November 2024. The tariff blends a fixed capacity charge with a gas-indexed energy charge (US CPI and PURC weighted average gas cost), with a take-or-pay obligation and FX pass-through. Change-in-law risk is borne by ECG.

Key terms

Offtaker
Electricity Company of Ghana (ECG)
Signing date
2024-11-08
Financial close
—
Commercial operation
—
Contract end
—
Contract duration
20 years
Contract status
Active
Tariff structure
Capacity + Energy
Capacity charge
—
Energy charge
—
Key risk features
Take-or-pay Currency indexation Change-in-law protection Termination compensation
Indexation formula
US CPI-U annual escalation on O&M components; fuel component tracks PURC's weighted average cost of gas; USD tariff paid in cedis with an FX adjustment reconciling AKSA's actual conversion gains or losses (incl. hedging costs).