GH-PPA-DRAFT-02
Astro Power 220 MW Combined-Cycle Power Plant, Aboadze
Astro Power Limited · Thermal (Gas) · 220.00 MW · Near Aboadze, Ghana
GH-PPA-DRAFT-02
Astro Power 220 MW Combined-Cycle Power Plant, Aboadze
Astro Power Limited · Thermal (Gas) · 220.00 MW · Near Aboadze, Ghana
Summary
A 220 MW (nominal) dual-fuel (gas/liquid) combined-cycle plant near Aboadze, supplying ECG under a 20-year capacity-and-energy PPA signed 13 October 2014 (extendable by 5 years). The tariff combines fixed and variable capacity charges with a heat-rate-based energy charge tied to gas or light crude oil pricing, and a take-or-pay obligation. Change-in-law risk is borne by ECG.
Key terms
- Offtaker
- Electricity Company of Ghana (ECG)
- Signing date
- 2014-10-13
- Financial close
- —
- Commercial operation
- —
- Contract end
- —
- Contract duration
- 20 years
- Contract status
- Active
- Tariff structure
- Capacity + Energy
- Capacity charge
- —
- Energy charge
- —
- Key risk features
- Take-or-pay Currency indexation Change-in-law protection
- Indexation formula
- No inflation index found for the capacity components. Gas price is fixed quarterly under the Gas Supply Agreement and passed through the tariff by PURC. The USD tariff is paid in cedis using a quarterly Exchange Rate Hedge Agreement, with the cost of the hedge also reimbursed to the Seller.