Astro Power 220 MW Combined-Cycle Power Plant, Aboadze

Astro Power Limited · Thermal (Gas) · 220.00 MW · Near Aboadze, Ghana

Summary

A 220 MW (nominal) dual-fuel (gas/liquid) combined-cycle plant near Aboadze, supplying ECG under a 20-year capacity-and-energy PPA signed 13 October 2014 (extendable by 5 years). The tariff combines fixed and variable capacity charges with a heat-rate-based energy charge tied to gas or light crude oil pricing, and a take-or-pay obligation. Change-in-law risk is borne by ECG.

Key terms

Offtaker
Electricity Company of Ghana (ECG)
Signing date
2014-10-13
Financial close
—
Commercial operation
—
Contract end
—
Contract duration
20 years
Contract status
Active
Tariff structure
Capacity + Energy
Capacity charge
—
Energy charge
—
Key risk features
Take-or-pay Currency indexation Change-in-law protection
Indexation formula
No inflation index found for the capacity components. Gas price is fixed quarterly under the Gas Supply Agreement and passed through the tariff by PURC. The USD tariff is paid in cedis using a quarterly Exchange Rate Hedge Agreement, with the cost of the hedge also reimbursed to the Seller.