{"generated_at":"2026-10-05T14:17:32+00:00","source":"Ghana PPA Portal \u2014 Ministry of Energy & Green Transition","count":13,"data":[{"id":13,"reference_code":"GH-PPA-DRAFT-08","project_name":"20 MW Thermal Generating Plant, Saltpond, Ghana","slug":"20-mw-thermal-generating-plant-saltpond-ghana-gh-ppa-draft-08","developer":"Lushann International Power Development (Ghana) Ltd","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"thermal_gas","label":"Thermal (Gas)"},"capacity_mw":20,"location":"Near Saltpond, Central Region, Ghana","dates":{"signing":"2008-05-20","financial_close":null,"commercial_operation":null,"contract_end":"2028-05-20"},"duration_years":20,"tariff":{"structure":"capacity_and_energy","structure_label":"Capacity + Energy","capacity_charge":null,"energy_charge":null,"currency":"USD","has_currency_indexation":false,"indexation_formula":"Energy Price adjusted annually via EP(new) = EP(old) + FPA + AIA, where FPA tracks actual fuel cost changes (natural gas or liquid fuel) from a US$4\/MMBTU base and AIA is an annual inflation allowance approved by PURC. Both the Energy Price and the Capacity Charge are additionally renegotiated with PURC and the Buyer after the first 10 years of the 20-year term."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":false,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":8,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":7040103,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/20-mw-thermal-generating-plant-saltpond-ghana-gh-ppa-draft-08\/documents\/8\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2008-05-20","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-03T11:27:20+00:00","updated_at":"2026-10-05T12:17:33+00:00"},{"id":6,"reference_code":"GH-PPA-DRAFT-01","project_name":"AKSA Takoradi 900 MW Combined Cycle Power Plant","slug":"aksa-takoradi-900-mw-combined-cycle-power-plant-gh-ppa-draft-01","developer":"AKSA Energy Company Ghana Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"thermal_gas","label":"Thermal (Gas)"},"capacity_mw":900,"location":"Takoradi, Ghana","dates":{"signing":"2024-11-08","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"capacity_and_energy","structure_label":"Capacity + Energy","capacity_charge":null,"energy_charge":null,"currency":"USD","has_currency_indexation":true,"indexation_formula":"US CPI-U annual escalation on O&M components; fuel component tracks PURC's weighted average cost of gas; USD tariff paid in cedis with an FX adjustment reconciling AKSA's actual conversion gains or losses (incl. hedging costs)."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":true},"procurement":null,"documents":[{"id":1,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":19615275,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/aksa-takoradi-900-mw-combined-cycle-power-plant-gh-ppa-draft-01\/documents\/1\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2024-11-08","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-03T11:27:02+00:00","updated_at":"2026-10-05T12:17:33+00:00"},{"id":7,"reference_code":"GH-PPA-DRAFT-02","project_name":"Astro Power 220 MW Combined-Cycle Power Plant, Aboadze","slug":"astro-power-220-mw-combined-cycle-power-plant-aboadze-gh-ppa-draft-02","developer":"Astro Power Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"thermal_gas","label":"Thermal (Gas)"},"capacity_mw":220,"location":"Near Aboadze, Ghana","dates":{"signing":"2014-10-13","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"capacity_and_energy","structure_label":"Capacity + Energy","capacity_charge":null,"energy_charge":null,"currency":"USD","has_currency_indexation":true,"indexation_formula":"No inflation index found for the capacity components. Gas price is fixed quarterly under the Gas Supply Agreement and passed through the tariff by PURC. The USD tariff is paid in cedis using a quarterly Exchange Rate Hedge Agreement, with the cost of the hedge also reimbursed to the Seller."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":2,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":15093228,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/astro-power-220-mw-combined-cycle-power-plant-aboadze-gh-ppa-draft-02\/documents\/2\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2014-10-13","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-03T11:27:04+00:00","updated_at":"2026-10-05T12:17:33+00:00"},{"id":8,"reference_code":"GH-PPA-DRAFT-03","project_name":"BXC 20 MW Solar Project, Gomoa Onyadze","slug":"bxc-20-mw-solar-project-gomoa-onyadze-gh-ppa-draft-03","developer":"BXC Company (Ghana) Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"solar_pv","label":"Solar PV"},"capacity_mw":20,"location":"Gomoa Onyadze, Gomoa East, Central Region, Ghana","dates":{"signing":"2013-06-17","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"20.1372","currency":"USD","has_currency_indexation":true,"indexation_formula":"Fixed USD rate for years 1-10, paid in Ghana cedis at the PURC-approved exchange rate; year-11 reset negotiated within a PURC range with a floor at the original rate, applying for the remaining 10 years of the 20-year term."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":false,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":3,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":10142906,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/bxc-20-mw-solar-project-gomoa-onyadze-gh-ppa-draft-03\/documents\/3\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2013-06-17","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:24:06+00:00","updated_at":"2026-10-05T12:24:06+00:00"},{"id":9,"reference_code":"GH-PPA-DRAFT-04","project_name":"BXC Aboadze Generation Project (378 MW Combined Cycle)","slug":"bxc-aboadze-generation-project-378-mw-combined-cycle-gh-ppa-draft-04","developer":"BXC Company (Ghana) Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"thermal_gas","label":"Thermal (Gas)"},"capacity_mw":378,"location":"Aboadze, Western Region, Ghana","dates":{"signing":"2016-09-05","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"capacity_and_energy","structure_label":"Capacity + Energy","capacity_charge":null,"energy_charge":null,"currency":"USD","has_currency_indexation":true,"indexation_formula":"Capital-recovery-and-tax component fixed for the Term. Fixed O&M and Variable O&M components escalate annually by a US price index (labelled 'Producer Price Index' in the PPA but citing the US Consumer Price Index series). Fuel price component adjusts quarterly under the Fuel Supply Agreement(s) and PURC's Automatic Adjustment Formula. Tariff is invoiced in USD and paid in Ghana Cedis using a Buyer-funded Hedged Exchange Rate."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":true},"procurement":null,"documents":[{"id":4,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":16121199,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/bxc-aboadze-generation-project-378-mw-combined-cycle-gh-ppa-draft-04\/documents\/4\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2016-09-05","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-03T11:27:16+00:00","updated_at":"2026-10-05T12:17:33+00:00"},{"id":11,"reference_code":"GH-PPA-DRAFT-06","project_name":"Chrispod 350 MW Dual-Fuel Combined Cycle Power Plant, Aboadze","slug":"chrispod-350-mw-dual-fuel-combined-cycle-power-plant-aboadze-gh-ppa-draft-06","developer":"Chrispod Hydro Power Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"thermal_gas","label":"Thermal (Gas)"},"capacity_mw":350,"location":"Aboadze, Western Region, Ghana","dates":{"signing":"2014-10-13","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"capacity_and_energy","structure_label":"Capacity + Energy","capacity_charge":null,"energy_charge":null,"currency":"USD","has_currency_indexation":true,"indexation_formula":"Capacity Charge components (0.0340 + 0.0234 US$\/kWh) fixed for the Term, no CPI escalation. Energy Charge tracks the actual natural gas price, fixed quarterly under the Gas Supply Agreement and passed through the tariff by PURC. USD tariff paid in Cedis via a Seller-sourced quarterly Hedged Exchange Rate communicated to and accepted by PURC."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":6,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":14186111,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/chrispod-350-mw-dual-fuel-combined-cycle-power-plant-aboadze-gh-ppa-draft-06\/documents\/6\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2014-10-13","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-03T11:27:13+00:00","updated_at":"2026-10-05T12:17:33+00:00"},{"id":10,"reference_code":"GH-PPA-DRAFT-05","project_name":"Ghana-Togo\/Benin Border Towns Cross-Border Electricity Supply Project","slug":"ghana-togobenin-border-towns-cross-border-electricity-supply-project-gh-ppa-draft-05","developer":"Electricity Company of Ghana (ECG)","developer_country":null,"offtaker":"Communaut\u00e9 \u00c9lectrique du B\u00e9nin (CEB)","technology":{"code":"other","label":"Other"},"capacity_mw":2,"location":"Ghana\u2013Togo border interconnection, Volta Region, Ghana","dates":{"signing":"2011-08-19","financial_close":null,"commercial_operation":"2010-10-28","contract_end":"2016-08-19"},"duration_years":5,"tariff":{"structure":"capacity_and_energy","structure_label":"Capacity + Energy","capacity_charge":null,"energy_charge":null,"currency":"USD","has_currency_indexation":false,"indexation_formula":"No automatic escalation formula in the tariff. The stated energy rate (20.0 US cents\/kWh) is pegged to the PURC SLT-HV tariff 'as at June 2010'; clause 11.6 allows Seller-initiated rate change proposals for cost reasons, periodic re-review in line with PURC's own tariff reviews, and mandatory review if demand exceeds 2,500 kW."},"risk_features":{"take_or_pay":false,"government_guarantee":false,"change_in_law_protection":false,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":5,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":5690539,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/ghana-togobenin-border-towns-cross-border-electricity-supply-project-gh-ppa-draft-05\/documents\/5\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2011-08-19","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:23:16+00:00","updated_at":"2026-10-05T12:23:16+00:00"},{"id":12,"reference_code":"GH-PPA-DRAFT-07","project_name":"Global Innovative Consulting 20 MW Solar PV Project, Gushei","slug":"global-innovative-consulting-20-mw-solar-pv-project-gushei-gh-ppa-draft-07","developer":"Global Innovative Consulting Company Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"solar_pv","label":"Solar PV"},"capacity_mw":20,"location":"Gushei, Tamale district, Northern Region, Ghana","dates":{"signing":"2015-07-24","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"18.2464","currency":"USD","has_currency_indexation":true,"indexation_formula":"Flat Feed-in-Tariff of 18.2464 US cents\/kWh, fixed for the full 20-year Term; no CPI or fuel-price indexation (solar). USD tariff paid in Cedis via a Seller-sourced Hedged Exchange Rate, reviewed quarterly in line with PURC's quarterly automatic tariff adjustments."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":7,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":15745276,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/global-innovative-consulting-20-mw-solar-pv-project-gushei-gh-ppa-draft-07\/documents\/7\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2015-07-24","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:23:56+00:00","updated_at":"2026-10-05T12:23:56+00:00"},{"id":14,"reference_code":"GH-PPA-DRAFT-09","project_name":"Meinergy 20 MW Solar PV Project, Central Region","slug":"meinergy-20-mw-solar-pv-project-central-region-gh-ppa-draft-09","developer":"Meinergy Technology Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"solar_pv","label":"Solar PV"},"capacity_mw":20,"location":"Central Region, Ghana","dates":{"signing":"2015-12-23","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"18.2464","currency":"USD","has_currency_indexation":true,"indexation_formula":"Feed-In-Tariff fixed at 18.2464 US cents\/kWh for the first 10 years of the Term; from year 11 the FIT is reset 'as approved by PURC' with no stated formula. Tariff invoiced in USD, paid in Cedis at a quarterly Hedged Exchange Rate filed with PURC."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":9,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":11923498,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/meinergy-20-mw-solar-pv-project-central-region-gh-ppa-draft-09\/documents\/9\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2015-12-23","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-03T11:27:10+00:00","updated_at":"2026-10-05T12:17:33+00:00"},{"id":15,"reference_code":"GH-PPA-DRAFT-10","project_name":"Safi Sana 100 kW Waste-to-Energy (Biogas CHP) Plant, Ashaiman","slug":"safi-sana-100-kw-waste-to-energy-biogas-chp-plant-ashaiman-gh-ppa-draft-10","developer":"Safi Sana Ghana Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"waste_to_energy","label":"Waste-to-Energy"},"capacity_mw":0.1000000000000000055511151231257827021181583404541015625,"location":"Ashaiman, Ashaiman Municipality, Greater Accra Region, Ghana","dates":{"signing":null,"financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":15,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"17.5100","currency":"USD","has_currency_indexation":true,"indexation_formula":"Feed-In-Tariff fixed at 17.51 US cents\/kWh from commercial operation to the 10th anniversary; thereafter reset every two years with PURC approval, no stated formula. 80% of the tariff is USD-denominated and paid in Cedis at a quarterly Hedged Exchange Rate filed with PURC; the remaining 20% local-cost component is billed and paid directly in Cedis."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":true,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":10,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":11811367,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/safi-sana-100-kw-waste-to-energy-biogas-chp-plant-ashaiman-gh-ppa-draft-10\/documents\/10\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2026-10-02","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:23:51+00:00","updated_at":"2026-10-05T12:23:51+00:00"},{"id":16,"reference_code":"GH-PPA-DRAFT-11","project_name":"Savanna Solar 400 MW Solar PV Project, Kusawgu","slug":"savanna-solar-400-mw-solar-pv-project-kusawgu-gh-ppa-draft-11","developer":"Savanna Solar Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"solar_pv","label":"Solar PV"},"capacity_mw":400,"location":"Kusawgu, Northern Region, Ghana","dates":{"signing":"2013-06-11","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":25,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"22.6372","currency":"USD","has_currency_indexation":false,"indexation_formula":"Fixed USD rate for years 1-10; year-11 reset negotiated within a PURC range with a floor at the original rate, applying for the remaining 15 years."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":false,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":11,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":9492544,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/savanna-solar-400-mw-solar-pv-project-kusawgu-gh-ppa-draft-11\/documents\/11\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2013-06-11","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:23:37+00:00","updated_at":"2026-10-05T12:23:37+00:00"},{"id":17,"reference_code":"GH-PPA-DRAFT-12","project_name":"TC's Energy 1,000 MW Sea Wave and Tidal Project, Ada","slug":"tcs-energy-1000-mw-sea-wave-and-tidal-project-ada-gh-ppa-draft-12","developer":"TC's Energy Limited","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"other","label":"Other"},"capacity_mw":1000,"location":"Ada, Greater Accra Region, Ghana","dates":{"signing":"2014-07-14","financial_close":null,"commercial_operation":null,"contract_end":null},"duration_years":20,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"10.0000","currency":"USD","has_currency_indexation":true,"indexation_formula":"Fixed USD rate for years 1-10, paid in Ghana cedis via a quarterly Exchange Rate Hedge Agreement; year-11 reset negotiated within a PURC range with a floor at the original rate, applying for the remaining 10 years. Once Stage 6 is operating, an annual Compensation\/Discount mechanism reconciles actual annual offtake against a 7,817.4-8,327.3 GWh band."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":false,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":12,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":12856541,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/tcs-energy-1000-mw-sea-wave-and-tidal-project-ada-gh-ppa-draft-12\/documents\/12\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2014-07-14","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:23:28+00:00","updated_at":"2026-10-05T12:23:28+00:00"},{"id":18,"reference_code":"GH-PPA-DRAFT-13","project_name":"Tropical Energy Resources 30-50 MW Renewable Energy Facility, Tema","slug":"tropical-energy-resources-30-50-mw-renewable-energy-facility-tema-gh-ppa-draft-13","developer":"Tropical Energy Resources Ltd","developer_country":null,"offtaker":"Electricity Company of Ghana (ECG)","technology":{"code":"other","label":"Other"},"capacity_mw":50,"location":"Near ECG's Dawhenya Primary Substation, Tema, Ghana","dates":{"signing":"2007-11-27","financial_close":null,"commercial_operation":null,"contract_end":"2022-11-27"},"duration_years":15,"tariff":{"structure":"energy_only","structure_label":"Energy-only","capacity_charge":null,"energy_charge":"7.0000","currency":"USD","has_currency_indexation":false,"indexation_formula":"Flat USD rate of 7.0 US cents\/kWh (or the PURC Bulk Generation Tariff if higher), capped at 10 US cents\/kWh, for the first 10 years; renegotiated with PURC and ECG thereafter, with no stated floor. Paid in USD or its cedi equivalent at the prevailing Interbank rate; no hedging mechanism."},"risk_features":{"take_or_pay":true,"government_guarantee":false,"change_in_law_protection":false,"force_majeure":true,"termination_compensation":false},"procurement":null,"documents":[{"id":13,"title":"Power Purchase Agreement (Redacted)","type":"main_agreement","size_bytes":5911074,"download_url":"https:\/\/staging.energymin.gov.gh\/contracts\/tropical-energy-resources-30-50-mw-renewable-energy-facility-tema-gh-ppa-draft-13\/documents\/13\/download"}],"versions":[{"label":"v1.0","change_type":"original","effective_date":"2007-11-27","summary":"Initial upload from the Ministry's audited key-terms review.","is_current":true}],"status":"published","published_at":"2026-10-05T12:23:23+00:00","updated_at":"2026-10-05T12:23:23+00:00"}]}